Building the Vendor Scorecard File
Important:
If you have upgraded to Release 8.6.9 or later and have a build
file created in a previous release, you must purge your old file
and create a new file prior to using the vendor scorecard.
|
Before you run the Vendor
Scorecard File Report or view
summary vendor scorecard information, build the scorecard file for
the specific parameters you are interested in viewing. You can schedule
the scorecard to build on a regular basis using the Phantom
Scheduler.
Note:The
system automatically schedules the scorecard file to build during
off hours. If the build does not complete prior to the phantom
stop time, the system stops building the file, and resumes again during
off hours.
For purchasing metrics, the vendor scorecard file includes only
purchase orders and direct sales orders that are completely received in
the system. The scorecard excludes
purchase orders that contain one or more credit items, as well as purchase
orders that are marked
as exceptional.
Depending on the volume of purchase orders and direct orders in your
system, the amount of data that the system analyzes to build the report
can be quite large. For this reason, we recommend that you build the scorecard
file once a month, or at least quarterly, and use the reload options to
gather data in the most efficient manner after you build the main file.
We also recommend that you schedule the process to run during non-work
hours.
Important:If
you want to save data from a previous file, save the reports you
have run on previous files to your computer prior to building
a new vendor scorecard file.
|
Building the Main Vendor Scorecard File
To use the vendor score card, you must first build the main vendor scorecard
file for the select buy lines you want to analyze. After you build the
main file, you can reload data and supplement the main file's data.
If you have successfully built a vendor scorecard file, when you open
the Vendor Scorecard File Build window, the Main Build Information section
is disabled. You can reload the data, add vendors
and buy lines to the existing data, or purge the scorecard file.
Note: If
you do not see the buy lines listed as expected, we recommend reviewing
how your buy lines are set up in Assigning
Vendors to Buy Lines. The Type field should be set to either Line, Both,
or the ScoreCard check box should
be selected.
Important:During
the Vendor Scorecard build process, in order to identify the buy
lines associated to a vendor, the system looks to the vendors
associated to the buy line. Since multiple vendors can be listed
for a buy line, the system first looks in the Buyline Vendor
Types window off Buy Line Maintenance
for vendors that specifically have the ScoreCard
check box selected for a vendor and then checks for any vendors
that are set to Line or Both in the Type
column.
|
To
build the main vendor scorecard file:
-
From the Reports
> End of MonthReports
> Vendor Scorecard
menu, select Vendor Scorecard
File Build to display the Vendor Scorecard File Build window.
-
Complete the following fields:
Field
|
Description
|
Start
Date and
End Date
|
Enter the first
date and last dates to include in the file.
|
Cost
Basis
|
Select the cost
basis, such as cost of goods sold (COGS) for which you want
to gather metrics. The system uses the basis you select here
to calculate the inventory metrics, such as average inventory
value and overstock inventory value, available in the scorecard.
The default is COGS-COST.
If you want to view inventory metrics
for a basis different than what you originally used to build
the file, you need to rebuild the file using the different
basis.
|
Overstock
Days
|
Enter the number
of days that a product needs to be in stock before you consider
it to be overstock. The system uses this number of days to
calculate the value of your overstock inventory from a vendor.
The default value is 90 days.
If you want to view overstock based on
a different time period, you need to purge
the scorecard file and rebuild it using a different number
of days.
|
Stagnant
Period
|
Enter the number
of months that a product needs to be in stock before you consider
it to be stagnant or dead stock. The system uses this number
of days to calculate the value of your stagnant inventory
from a vendor. The default value is 12 months.
If you want to evaluate stagnant stock
based on a different time period, you need to purge
the scorecard file and rebuild it using a different number
of days.
|
-
From the File
menu, select Buy Lines
to display the Buy Line List window, add the buy lines you want
to include in the main build file, and click OK.
You must select at least one buy line for the build file.
-
From the File
menu, select Vendors to
display the Vendor List window, add the vendors you want to include
in the main build file, and click OK.
-
Set
options, if needed, and generate the file.
Note:
The system automatically schedules the scorecard file to build during
off hours. Use the Vendor Scorecard File Build Detail Schedule window
to schedule the build to sleep at peak operation times so the system
remains running efficiently.
Scheduling Build Sleep Times
You can send your vendor scorecard build to run at any time. However,
Eclipse provides tools to let you define when you want to suspend the
build process so you do not impact your daily operations. For example,
if you know Saturday mornings are particularly busy times in your warehouse,
you can put the build on hold from 7:00 AM to 12:00PM on Saturdays so
that your system runs optimally during that time.
To
schedule sleep times for the build:
-
Set
up your vendor scorecard build as usual. (See previous procedure)
-
From the File
menu, select Detail Schedule.
-
Use the following options
to tell the system when to suspend the build process.
Field
|
Description
|
M-F Sleep From / To
|
Enter the time to stop (From) and restart
(To) the build process. For example, if you want to suspend
the build between 8:00AM and 12:00PM, enter the following:
|
Saturday
Sleep From / To
|
Sunday
Sleep From / To
|
-
Click OK
to save your changes.
Reloading Build Data
If you need to add data for recent purchase orders, add vendors or buy
lines, or reload a portion of data to gather corrections you have made,
use the reload options to gather the data in the most efficient manner
without having to purge and recreate the main build file.
If you need to change the initial date range, cost basis, overstock
days, or stagnant period information, you need to purge
the main build file and recreate it.
To
reload vendor scorecard data:
-
From the Reports
> End of MonthReports
> Vendor Scorecard
menu, select Vendor Scorecard
File Build to display the Vendor Scorecard File Build window.
-
Select from the following
reload options:
Field
|
Description
|
Load
Starting from Last Build
|
Select this option
if you want to update the main build file to contain your
most recent data. The system gathers data from the date listed
in the End Date field
in the Main Build Information section up until the current
day, and adds the data to the main build file.
Use this option to gather the most recent
data for your selected vendors and buy lines to save time,
instead of rebuilding the main file.
|
Load
New Vendors/Buy Lines
|
Select this option
if you want to add new vendors or buy lines to the initial
data. The system gathers the data for the additional vendors
or buy lines for the dates specified in the Start
Date and End Date
fields for the main build file.
Use the File
> Vendors and File
> Buy Lines options to add the additional vendors
and buy lines.
|
Reload
Already Built Data
|
Select this option
if you want to reload all or a portion of the data that already
exists in the main build file. For example, if you had purchase
orders marked as exceptional and changed that indication,
or received purchase orders into the system late, you can
rebuild the data to gather all the correct information for
a vendor or buy line using this option. Enter the date range
for which you want to reload the data in the Reload
Start Date and Reload
End Date fields.
Note:
You can reload data only within the date range specified for
the main build. If you need to include data before or after
those dates, purge
the main build file and create it again.
|
-
Set
options, if needed, and generate the file.
Note:
The system automatically schedules the scorecard file to build during
off hours. If the build does not complete prior to the phantom
stop time, the system stops building the file, and resumes again
during off hours.
See Also:
Running the Vendor
Scorecard File Report
Logging Vendor
Shipping Inaccuracies